SUCH SIGNS SHALL BE ORANGE,3'X3',DIAMOND SHAPE,WITH 4" BLACK LETTERING. Canopy authorizations and permits are required to place a canopy over the sidewalk. A NYCDEP BIOSWALE/STORMWATER GREENSTREET IS LOCATED ON THIS STREET. (See Chapter 4, Section 4.5 Street Construction Inspections and Enforcement regarding the circumstances in which summonses/NOVs may be issued.). COORD. WORK HOURS 7 AM - 10 PM MON-FRI, AND 8 AM - 10P M SATURDAY, AND 9 AM TO 10 PM SUNDAY. SOUTH CURB LANE MAY BE OCCUPIED AT ALL TIMES.FOR PUMPING OPERATION MAY ALSO TAKE THE ADJACENT LANE 7AM-4PM MONDAY TO FRIDAY WHILE MAINTAINING ONE 11 FOOT LANE FOR TRAFFIC. During the final design stage of a city project, DDC will also hold a series of alignment meetings with the utilities and other agencies to inform them about proposed changes to the location of street infrastructure that would require facility relocation. PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND, YOU MUST CONTACT THE NYCDOT RED LIGHT CAMERA UNIT TO OBTAIN THE CONSTRUCTION AND MARKINGS PLANS FOR THIS WORK AREA. A single PDF of the 619 Standard Sheets is available at the . (212) 839-2475 SECTION24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Jamaica, NY 11435 With this cursor, users can click on the map to get information about a particular map layer. COORDINATE WITH NYSDOT PRIOR TO WORK. MAINTAIN A 5-FOOT CLEAR SIDEWALK WHEN WORKING ON THE ROADWAY AND A 5-FOOT PROTECTED PEDESTRIAN WALKWAY IN THE ROADWAY MEETING NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY WHEN WORKING ON THE SIDEWALK. CGL insurance. Listed in the table are the most commonly requested Building Operations/Construction Activity Permit types, which may be used when completing an application. Asingle PDF of the 619 Standard Sheets is available attheOfficial Electronic Standard Specifications and Standard Sheets website. Building Operations/Construction Activity Permits are generally taken out by entities that perform construction activities, including developers and contractors. MOBILAZATION OF PROJECT INCLUDING RE-STRIPPING OF ROADWAY AND INSTALLATION OF BARRIERS WORK ONLY 10PM TO 6AM MON TO FRI AND 10PM TO 8AM SAT AND SUNDAY. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EQUIPMENT, VEHICLES AND PERSONNEL ON OR AROUND WORK SITE. WORK 7 PM-10 AM WEEKNIGHTS. OFFICE. MAY WORK 7AM TO 8PM IN PARKING LANE ONLY TO OPEN UNDERGROUND STREET ACCESS COVERS FOR REPAIRS AND OR CABLE PULLS. If work is planned through the HE period, the critical reasons for the work must be included in the Work Description field of the application. RESTORE ALL TRAVEL LANES WHEN SITE IS UNATTENDED CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. Re-Dig (RED) hold In cases where an inspection has revealed a failed restoration and permittees have been told to redo the entire restoration, a RED hold will be placed. If the applicant makes any changes to these authorized representative(s), he or she must update the Permittee Registration Application. Visit the DEC website at the following address to determine the appropriate contact http://www.dec.ny.gov/63.html, Metropolitan Transportation Authority (MTA) Bus Operations MAINTAIN 5 FOOT PED. Attn: Forestry The NYCDOT Standard Details of Construction have been updated to include the revised H-1011 drawings covering pedestrian ramps. 1/2RES-RESTORE AS PER SKETCH #8 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Second, after obtaining HIQA's authorization, the applicant must obtain a permit to install the canopy at the approved location and apply for a permit to maintain the canopy once it is installed. PRIOR TO BEGINNING ANY WORK, TO ENSURE THAT YOU RESTORE IN-KIND, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. WORK ALSO ALLOWED 10 AM TO 6 PM SATURDAY. MANTAIN 1 13 FOOT LANE EAST BOUND, 1 15 FOOT LANE WEST BOUND. Outlined below are the basic procedures in applying for a Sidewalk Repair Permit by mail: The New York City New York, NY 10007 It could be because it is not supported, or that JavaScript is intentionally disabled. The stipulation text on a NYC DOT permit is the official text, with which a permittee must comply. An Occupancy of Roadway Permit is required for closing all or part of one or more lanes of roadway and/or during blasting operations. The Office of Construction Mitigation and Coordination (OCMC) reviews all construction permit applications and develops construction activity, Completed Permittee Registration Application. An EAN is required for each utility access cover opening at a location, provided that the work is performed around the clock until the emergency is eliminated, at which time the EAN expires. ALL WORK MUST BE PREAPPROVED BY LANDMARK PRESERVATION COMMISSION. Upon completion of work, sidewalks must be restored according to Highway Rules, Section 2-09(f)(4) and NYC DOT Standard Highway Specifications. VARIANCE GRANTED TO WORK DURING SCHOOL HOURS AS STIPULATED BY O.C.M.C. Due to upcoming major building rehabilitation at 1400 Williamsbridge Road. PERMITTEE MUST EMAIL DEP AT. However the permit window remains open until 3:15 PM to pick up permits. From a block party, which opens a single block to community activities for a day, to Summer Streets, which dedicates over 7 miles of streets to pedestrians, runners, and cyclists, programming reminds New Yorkers that streets are public space, and should support active, healthy, and sustainable lifestyles. This chapter describes the basic steps for performing work in the street, for restoring the street after work is performed, and for responding to each type of notice or request that may be issued during a Highway Inspection and Quality Assurance (HIQA) inspection. If there is no hold, the permit is issued to the applicant after appropriate payment is received. City streets facilitate the movement of pedestrians, transit riders, motorists and cyclists as well as the delivery of goods and services throughout the city. Fax: (718) 858-0069, Manhattan New York, NY 10007 Street excavations must be performed in accordance with Section 2-11 (e) of the Highway Rules. Fax: (212) 860-1359 Download about 619 . Each applicant must obtain and provide Worker's Compensation insurance in accordance with the laws of the State of New York from a licensed insurance company. By eliminating manual steps, most permit requests now may be approved and issued within 1-2 business days. Any of these holds will prevent a permittee from applying for new permits: New York City Department of Finance (DOF or Finance) hold If a permittee has failed to pay previously issued summonses/Notices of Violation (NOVs) to the New York City Environmental Control Board (ECB), all future permit requests may be placed on hold until the fees associated with the outstanding summonses/NOVs are paid. A temporary sidewalk closure while a sidewalk repair is underway. SEND RESPONSES TO NYCDOT DIV. If guide sheets are to be included in a project, they should be included in a subset under that project. OCCUPY 12 FOOT WIDTH OF ROADWAY. SIGNS SHALL BE POSTED MIN OF 48-HRS PRIOR TO START OF WRK & IMMEDIATELY REMOVED UPON COMPLETION OF WRK OR PERMIT EXPIRATION. NO LANE CLOSURES PERMITTED TWO HOURS PRIOR TO BARCLAYS CENTER EVENTS THROUGH TWO HOURS AFTER THE EVENT HAS ENDED. 55 Water Street, New York, NY 10041 FOR DRILLING OPERATION MAY WORK 7AM-6PM MONDAY - FRIDAY IN CURB LANE AND PART OF SIDEWALK. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR EXTENDED TRENCH MORE THAN REGULAR CUT-BACK AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). The NYC Street Works Manual describes policies governing work on city streets, and presents procedures for notice, approval and execution of such work. This category of permits applies to authorizations and permits required to place a canopy* over the sidewalk. Upon receipt of the above and verification for completeness, a Sidewalk Repair Permit will be issued and mailed to the applicant. LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY IS PROHIBITED. NYC DOT hosts borough-level meetings to discuss the scheduling of upcoming resurfacing projects with utility companies and other potential street excavators. Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (US Customary) > 619 Work Zone Traffic Control 619 SHEETS EFFECTIVE BEFORE LETTING OF MAY 1, 2022 ARE AVAILABLE IN THE TABLES BELOW Notes: 1. A list of partially and fully restricted streets where canopy placement is limited or prohibited can be found in the Highway Rules, Section 2-04(f). POSTING OF SIGNS ON MTA/NYCT ANTENNA POLES IS PROHIBITED. Once the canopy installation permit application has been reviewed and approved by the Permit Office, the permit is issued to the canopy installer or authorized agent, and canopy installation can begin. ROADWAY MUST BE RESTORED IN KIND. Longitudinal SlopeThe longitudinal slope of the sidewalk must be uniform and parallel to the curb at the curb's proper grade. If the applicant intends to do work associated with a Franchise, Concession or Revocable Consent Agreement, the applicant must have a copy of the Agreement prior to applying for a permit. OF BRIDGES: UPON INITIAL INSTALLATION OF A CANOPY, THE PERMIT TO MAINTAIN A CANOPY SHALL BE PLACED ON HOLD UNTIL A FINAL INSPECTION DETERMINES CANOPY WAS INSTALLED AS PER SUBMITTED PLANS. Emergency work will not be placed on hold and shall proceed in accordance with Highway Rules, Section 2-11 (g). Tel: (212) 788-6600, New York City Landmarks Preservation Commission (LPC) Fax: (718) 816-9194 CONTAINER SHALL NOT BE STORED OR PLACED WITHIN: (I) "NO STOPPING","NO PARKING ANYTIME" OR "AUTHORIZED PARKING" AREAS. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. A CITYBENCH IS/WILL BE LOCATED ON THIS STREET. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. POST "NO STANDING 7AM- 6PM M-F" SIGNS ON THE NORTH CURB. The Permit Bureau issues a number of different categories of construction-related permits for work on a street. Permanent RestorationUpon completion of work in a street, permittees are required to restore all street openings/excavations in accordance with the Highway Rules, Section 2-11(e) including, but not limited to, the following required restoration elements: Temporary RestorationIf street opening/excavation work remains unfinished at the end of the day, the permittee must perform temporary repairs in accordance with the Highway Rules, Section 2-11(e) including, but not limited to the following requirements: Street restoration following utility work, 18th Street and Irving Place, Manhattan. Ride the Staten Island Ferry. DOB approval is also required. If the work is more than 100 feet away from the bridge structure, applicants must send a certification by e-mail stating so. Click here to download. The construction, alteration or repair of any building vault or transformer vault requires a permit from NYC DOT. Generally, applicants must provide business and contact information; proposed work information, including location, size of proposed work, and the work start and end date; type of permit(s) being requested; detailed work zone sketch; and date and signature of applicant or authorized representative. A 4' X 4' FIXED ORANGE CONSTRUCTION SIGN WITH 5" BLACK LETTERING MUST BE PLACED A MINIMUM OF 7 CALENDAR DAYS PRIOR TO CLOSURE AT A LOCATION ENTERING THE STREET TO BE CLOSED. LANE MUST BE AN UNRESTRICTED PARKING LANE. 59 Maiden Lane, 37th floor CONSTRUCTION PROJECT INFORMATIONAL SIGN REQUIRED PER DOT HWY RULE SEC 2-02(C) 4 & 5. WORK 8 AM TO 7 PM MONDAY TO FRIDAY. After repairs are complete, the property owner can contact 311 to schedule a Sidewalk Violation Dismissal. Its overall goals are both far-reaching and vital: sustaining the city's investment in its streets, enhancing access to subsurface infrastructure and minimizing transportation and community disruptions. Adjoining Existing and New SidewalksJunctions and transitions between new and existing sidewalks must conform to specifications. Minimum slopes should be used wherever possible. Information on restoration requirements following street openings/excavations can be found inChapter 4 Executing Work in the Street. The Glossary and definitions found in this Manual provide a brief explanation of NYC DOT terminology. New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . NYC DOT's mission is to provide for the safe, efficient and environmentally responsible movement of pedestrians, goods, bicycles and vehicular traffic on the streets of the city of New York. THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS. In addition, a second permit must be applied for to maintain the canopy. Office hours: 8:30 AM-5:00 PM, Brooklyn The organization of the Street Works Manual generally follows the chronological process of planning and undertaking work in the street. With advance notice of NYC DOT's intent to work in a particular location, utility companies and other potential street excavators are better able to make arrangements to minimize potential conflicts or to leverage the opportunity to perform their work before resurfacing or reconstruction is complete. Department of Transportation. WORK HOURS 7 AM - 10 PM MON-FRI, AND 10 AM - 7 PM SAT AND SUN. At the HIQA borough office, applicants will be given a Canopy Authorization Application (. Appendices to the Street Works Manual provide additional resources, including a list of common permit types and the supporting documentation required for each permit type, reference copies of applications and required forms, contact information for NYC DOT and other agencies and utilities, a list of the stipulations placed on permits under certain conditions and/or at certain locations, and useful internet links by chapter of the Manual. FULL WIDTH OF SIDEWALK SHALL BE OPENED TO PEDESTRIANS WHEN SITE IS UNATTENDED EXCEPT FOR CONCRETE CURING WHEN THAT PORTION OF THE SIDEWALK MAY REMAIN CLOSED PROVIDED ALL OTHER STIPULATIONS ON THIS PERMIT ARE COMPLIED WITH. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. New York City Department of Consumer Affairs (DCA) Long Island City, NY 11101 MAY ALSO CLOSE SIDEWALK ON NORTH SIDE FRONTING DEVELOPMENT. Work Site Safety All obstructions on the street must be protected by barricades, fencing, railing with flags, lights, and/or signs placed at proper intervals and at prescribed hours in accordance with the most recent version of the Manual on Uniform Traffic Control Devices (MUTCD), published by the Federal Highway Administration, and the New York State Supplement. The instructions below apply to corporations, partnerships, joint ventures and individuals. 210 Joralemon Street, 8th Floor Working Without a Permit If the permittee has been issued a summons/NOV for working without a permit, all future permit requests may be placed on hold until the applicant takes out a permit of record for the work that was performed. Listed in the table are the most commonly requested Sidewalk Construction Permit types, which may be used when completing an application. WORK ALLOWED 8 PM TO 6 AM NIGHTLY. Prior to any permit revocation, NYC DOT will give the permittee an opportunity to be heard with not less than two days' notice. (212) 839-8856, The Bronx Tel: (212) 860-1845, Queens Each canopy maintenance permit expires one year after the date of issuance, unless revoked sooner by NYC DOT. Thousands of miles of utility pipes, cables and other equipment are beneath the streets of New York City. Canopy placement must be adequate for public safety and must be suitable to the circumstances of the proposed canopy location and not interfere with the public use of the sidewalk. This section describes the application and review process for obtaining approvals to construct or repair vaults under the sidewalks of New York City streets. ONE 11-FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY, ON WEEKENDS, DEFINED AS 12:01AM SATURDAY THROUGH 6AM MONDAY. SECTION 7: AUTHORIZED REPRESENTATIVES TO OBTAIN PERMITS. 47-40 21st Street - 7th Floor Brooklyn, NY 11202 THIS STIP IS USED FOR WORK IN NUMEROUS LANES BUT NOT FOR THE ENTIRE LENGTH OF THE BLOCK. STLRES-RESTORE AS PER SKETCH #3 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. 6. or Tax I.D. FOR ANY CAPITAL WORK INVOLVING CURB-TO- CURB RESURFACING OF THE STREET,PERMITTEE AND RESIDENT ENGINEER FOR THE SPONSORING AGENCY SHALL NOTIFY THE APPROPRIATE DOT BOROUGH ADMIN. The Guarantee Period is considered to be three years on unprotected streets, and up to five years, but at no time less than three years, on protected (recently resurfaced or reconstructed) streets commencing on the restoration completion date. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The contact information and hours of operation can be found in Appendix C, NYC DOT Contact Information. (718) 222-7307 SIDEWALK RESTORATION AT THIS LOCATION REQUIRES SIDEWALK STANDARD 4.13C. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. All addresses must be the same on all above referenced documents. * Clear Path (pedestrian walkway): This directive is intended to provide pedestrians with the maximum amount of safety and space to traverse the sidewalk. This requires a minimum distance on narrow sidewalks (10-12 feet Secondary Streets) of 5 ft., or a minimum distance on wide sidewalks (Larger than 12 feet Main Streets) of 8 ft. Download about 619-011: Work Zone Traffic Control General Tables & Legend; General Information 619-012: Sign Table Keywords: Sign, Table. Once OCMC executive staff determines the final permit stipulations, the permit will be released. If a contractor is being used, the contractor must be registered with NYC DOT and must take out the permit. The construction of any vault that extends beyond the curb must be authorized under a revocable consent agreement, as required in Section 2-13(c) of the Highway Rules, in addition to approval by PEU. RESTORATION MUST BE FULL DEPTH CONCRETE AS PER FIRST AVE SPEC,1042A,B & 1050. Click here to view a sample certification formand in Appendix B, Forms. If the proposed work location is in protected street status, the application will automatically be placed on SAM hold for further review. NO NOISY WORK 10 PM TO 7 AM M-F, 10 PM FRIDAY TO 8 AM SATURDAY, 10 PM SATURDAY TO 9 AM SUNDAY AND 10 PM SUNDAY TO 7 AM MONDAY. A table showing the agencies that must be contacted prior to applying for certain NYC DOT permit types can be found in, If the applicant intends to work on a contract that has been awarded by a government agency or authority, the applicant must bring a copy of the contract, Order on Letter, Notice to Proceed or a Letter of Authorization. OCCUPY A MAXIMUM OF 12 FT OF ROADWAY FOR ASBESTOS REMOVAL ONLY BETWEEN THE HOURS OF 7PM - 6AM, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN FOUR 11 FOOT LANES, TWO 11 FOOT LANES ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING CENTER MALL. MUST BE AN UNRESTRICTED PARKING LANE. THE CONTRACTOR SHALL MAINTAIN (1) EITHER A 5-FOOT CLEAR SIDEWALK FOR PEDESTRIAN ACCESS AT ALL TIMES,(2) A PROTECTED WALKWAY IN THE ROADWAY MEETING ALL NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY OR,(3) A NYCDOB APPROVED PROTECTED WALKWAY THORUGH THE BUILDING. Payment of the waiver request fee, as specified in the Highway Rules, Section 2-03, does not guarantee that approval to work during the embargo period will be granted. CONTINUED: (II) FIFTEEN FEET OF HYDRANTS (III) A CROSSWALK OR PEDESTRIAN RAMP, NOR SHALL IT BE STORED OR PLACED IN ANY MANNER AS TO OBSTRUCT ANY CROSSWALK OR PEDESTRIAN RAMP. Any foundation material not meeting specifications must be removed. FULL WIDTH OF ROADWAY NOT REQUIRED DURING CONCRETE CURING PERIOD. NO WORK CAN OCCUR WITHIN 2 BLOCKS OF AN ACTIVELY OPERATING NYCDDC SITE. Tel: (646) 252-5517 or (646) 252-5544, New York State Department of Transportation (NYSDOT) See the Highway Rules, Section 2-02(j). IF RENEWED OR REISSUED, THIS PERMIT SHALL NOT BE PLACED ON HOLD. If the installed canopy passes final inspection, HIQA releases the CAN hold on the canopy maintenance permit and notifies the original applicant. THIS PERMIT ACTIVITY MAY NOT START UNTIL THE PERMITTEE COORDINATES ALL WORK WITH ANY ONGOING CONSTRUCTION & WITH THE PROJECT/RESIDENT ENGINEER FOR ANY ONGOING CAPITAL PROJECTS. In some cases, approval from the LPC (if the vault is in an historic district) or the Metropolitan Transportation Authority (MTA) (if the vault is near a subway or tunnel entrance) is required. In this case, upon request of the permittee, NYC DOT will provide an opportunity to object to the permit revocation within five days after the request is received by NYC DOT. Long Island City, NY 11101 The completed Permittee Registration Application and other required documents must be submitted in person to the NYC DOT central Permit Office to complete the registration process. Applicants must first submit an Emergency Authorization Number Form. STREETBOND COLORANT IS ADDED TO PROVIDE COLOR. Applicant should submit this form with the appropriate documentation and waiver request fee. For hearings, Monday to Friday from 8:30 AM to 3:30 PM. Orders, given orally or in writing, may be issued by the Commissioner to cease and desist work or to perform remedial action. ALL WORK TO MEET OR EXCEED NYC DOT STANDARDS. This information should be used to plan work before streets go into protected street status. Access the, If the applicant intends to fully close a roadway, a. DOTs lighting-levels and uniformity guidelines are based on those established by the IES Roadway Lighting standard RP-8-14 (or more stringent where needed). SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. (212) 839-9561/9566 Tel: (718) 482-4516 HOWEVER IT MUST BE PRESENTED FOR EXTENSION NO LATER THAN 5 BUS DAYS PRIOR TO EXPIRING. WORK SATURDAY, 8 AM-6 PM AND SUNDAY 9 AM-6 PM. THE SIGNS SHOULD BE POSTED ON ALL POLES AND DRIVE RAILS ON THE SEGMENT AFFECTED INDICATING THE DATE OF THE CHANGE, THE NEW REGULATIONS AND A TELEPHONE NUMBER TO OBTAIN INFORMATION. Listed on the following page are the most commonly requested Street Opening Permit types which may be used when completing an application. THE ROADWAY AND/OR SIDEWALK SHALL BE REPLACED IN-KIND. Markets, public art, performances, and other events support a vital public realm, increasing pedestrian activity;supporting local businesses;connecting residents with resources;celebrating community, culture, and diversity;and encouraging local ownership of the public spaces in which they occur. In addition, the streets serve as the access point for the subsurface infrastructure that provides water, sewer, power, and telecommunications services for the city. A collection of manuals, specifications, and other publications relevant to the Office of Traffic Operations. New York, NY 10038 1FTRES-RESTORE AS PER SKETCH #9 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. A dismissal inspection is always required to close out a violation. FIVE OR MORE SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. SignageSigns must be displayed at the work site or at 100-foot intervals along a series of excavations or continuous cuts indicating the name of the entity performing the work, the name of the entity for whom the work is being performed and, if applicable, the name(s) of the subcontractor(s). SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. It also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. Check all types of work that will be performed by the applicant or his/her corporation. SPEED REDUCERS ARE PROPOSED FOR THE ROADWAY OF YOR WORK AREA. FULL CORNER QUADRANT RESTORATION IS REQUIRED FOR ALL CORNER QUADRANTS EXCAVATED. To request release of a RED hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed. IF CURB LANE BECOMES A TRAVEL LANE THIS STIP DOES NOT APPLY. Revenue hold If the permittee owes NYC DOT money for an open Corrective Action Request (CAR) or Jolt Elimination Team (JET) bill, all future permit requests may be placed on hold until the bills are paid. WORK NIGHTLY 9 PM - 6 AM SUNDAY NIGHT TO FRIDAY MORNING AND 9 PM FRIDAY TO 6 AM SUNDAY. Brooklyn, NY 11215 THIS PERMIT ONLY ALLOWS FOR THE CLOSURE OF A ROADWAY OR SIDEWALK AS STIPULATED. WORK MAY OCCUR FOR MSO ONLY FROM 7PM FRIDAY TO 6:00AM MONDAY, 24 HRS A DAY. DOT uses higher wattages on wide or commercial corridors and lower wattages on narrow or residential streets. The Protected Streets Listing consists of four separate files, each covering all five boroughs: All streets on the "Active/Future" lists show the anticipated start date of the project. For further information regarding fees, the applicant should refer to Section 2-03 of the Highway Rules. (718)786-8589 OR (718)786-8407, ONE SPEED REDUCER IS LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA. These are in addition to the "Common Requirements" listed at the beginning of this section. NYC Parks & Recreation To release an FCR hold, the applicant must demonstrate that either he or she has begun the CRIA process or that the CRIA statement is not required. These forms may also be found inAppendix B, Forms. THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. This Street Opening Permit retroactively covers the emergency street opening/excavation work already performed. INTRES-RESTORE AS PER SKETCH #7 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. ALL CLOSURES ARE CONFINED TO 15 FEET TO THE NEW EAST CURB LINE. New York, NY 10007 EAU will process the request and fax or call the applicant with an Emergency Street Opening Permit Number, which authorizes the emergency street opening/excavation work. Kew Gardens, NY 11424 Upon completion of the inspection, HIQA makes a final determination as to whether the location is suitable for a canopy placement. Failure to comply with an order issued by the Commissioner may result in criminal or civil penalties. MAINTAIN 2 LANES SOUTHBOUND AND 1 LANE NORTHBOUND FROM 7AM-9AM M-F. Office hours: 8:30 AM-4:30 PM. Fax: 212-720-3488, Queens The form must be completed and faxed to NYC DOTs Emergency Authorization Unit (EAU), which will confirm that the applicant's insurance is current and that the location requires an EAN. DURING THESE CLOSURES ALL CONSTRUCTION EMBARGOS AND/OR TEMPORARY CONSTRUCTION PARKING RESTRICTIONS MUST BE COMPLIED WITH. Moreover, the Third Edition is available onlineto increase the reach and accessibility of this essential reference document. CTDOT_Traffic . Included are topics about Policy, Procedures, Specifications and Design Standards (Manuals, Guidelines, and Computer Aided Design and Drafting drawings). Tel: (718) 482-4825. Tel: 311 or (718) 422-8700, Public Design Commission of the City of New York (PDC) To have the hold released, the permittee must correct the unsafe condition, and then contact HIQA to arrange for an inspection. Please open each of the below search results in a new tab or window (using a right-click or CTRL-click) to alleviate an occasional error that may occur when using a browser's back button.
Ryan Lucy Shula,
Tucson Death Notices 2022,
Why Do I Have A Daddy Kink,
Articles N